This stage should take me about 3 days to complete. | This stage should take me about 3 days to complete. | ||
=== Notes to time estimates === | === Notes to time estimates === | ||
I think my time estimates are rather conservative, but I would rather work on other programs (the documentation contains another article located [http://www.mpipks-dresden.mpg.de/~tisean/Tisean_3.0.1/docs/surropaper/Surrogates.html| here]) than to be overwhelmed with the work and try to rush trough. As I am not fully familiar with the mathematical concepts discussed within these articles I want to make sure that I reduce the possibility of error when linking programs to octave to a minimum. If I vastly overestimated the time I will need to port those functions I intend to finish the 'Visualization, non-stationary' section of the work on nonlinear timeseries and then proceed to programs from the 'Surrogate time series article'. | Totaling up the above estimates I think my time estimates are rather conservative, but I would rather work on other programs (the documentation contains another article located [http://www.mpipks-dresden.mpg.de/~tisean/Tisean_3.0.1/docs/surropaper/Surrogates.html| here]) than to be overwhelmed with the work and try to rush trough. As I am not fully familiar with the mathematical concepts discussed within these articles I want to make sure that I reduce the possibility of error when linking programs to octave to a minimum. If I vastly overestimated the time I will need to port those functions I intend to finish the 'Visualization, non-stationary' section of the work on nonlinear timeseries and then proceed to programs from the 'Surrogate time series article'. | ||
edits