Line 47: | Line 47: | ||
** Do you like to code a proof of concept to 'see how it turns out', modifying that and taking the risk of having work thrown away if it doesn't match what the project or original proponent had in mind?(NO) | ** Do you like to code a proof of concept to 'see how it turns out', modifying that and taking the risk of having work thrown away if it doesn't match what the project or original proponent had in mind?(NO) | ||
== Y: Your task == | == Y: Your task == | ||
* I have selected the following task from GSoC projects page | * I have selected the following task from GSoC projects page[http://wiki.octave.org/Summer_of_Code_Project_Ideas]. | ||
** I would like to | ** I would like to contribute to the mapping package, specifically the implementations of functions missing in Coordinates, Geodesy, Projections and Standard I/O. The list of functions in the map toolbox for Matlab are listed here[http://www.mathworks.in/help/map/functionlist.html]. I have already contributed the 3D coordinate functions to this package[https://savannah.gnu.org/patch/index.php?8377]. | ||
* ''' | * '''Rough time estimates:''' | ||
**Week 0 (May 19 to May 26): Complete the | * For Mapping Package: | ||
**Week 1 to Week 4 ( | ** '''Detailed Schedule:''' [https://docs.google.com/spreadsheet/ccc?key=0AopkixSrywUIdHYybXZzTlpNdFM2NDd3cUIzNkNuR1E&usp=sharing] | ||
**Week 5 to Week 7 (June 26 to July 14): Complete the | ** Week 0 (May 19 to May 26): Familiarizing with Octave code. Complete the tests for 3D Coordinate system functions that I have already implemented. | ||
**Week 8 to Week | ** Week 1 to Week 4 (June 3 to June 25): Complete the implementation of missing functions that are selected in week 0 from Modelling the Earth[http://www.mathworks.in/help/map/modeling-the-earth.html] and Lengths and angles [http://www.mathworks.in/help/map/lengths-and-angles.html]. Submit the almost complete Coordinate systems and Geodesy functions package for mid term evaluation. | ||
**Week 11 to Week 12 (August | ** Week 5 to Week 7 (June 26 to July 14): Complete Map Display functions by using Mapnik [http://mapnik.org/] to render the maps. Complete testing of the functions by Week 7. | ||
**After GSOC: Maintenance | ** Week 8 to Week 11 (July 15 to August 9): Complete Standard I/O functions from the open source implementations present in the detailed schedule. Complete testing of the functions by Week 11) | ||
** Week 11 to Week 12 (August 10 to August 18): Fixing bugs, code clean up and Making the entire code Matlab compatible. Write remaining tests and Documentation. Code clean up and finalization. End of GSOC. | |||
** After GSOC: Maintenance of Mapping Package in Octave Forge. | |||
I have planned a 25 to 30 hour work schedule for every week. | |||
I have planned | |||