Editing User:Erigualter

Jump to navigation Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.

Latest revision Your text
Line 1: Line 1:
= Public application - Erivelton Gualter (dev101) =
= Public application - Erivelton Gualter =


== A: An introduction ==
== A: An introduction ==
Line 30: Line 30:
<gallery heights=400px mode="slideshow">
<gallery heights=400px mode="slideshow">
File:GUI.png|Simulator of gait walking with amputee subjects using prosthesis built.
File:GUI.png|Simulator of gait walking with amputee subjects using prosthesis built.
File:pendulum.png|[https://github.com/EriveltonGualter/Inverted-Pendulum Inverted Pendulum Interface to simulate different parameters].
File:pendulum.png|Inverted Pendulum Interface to simulate different parameters.
File:wheelchair.jpg|[https://youtu.be/rjgii2i_xP4 Power-Assisted Wheelchair. Embedded Controller in C].
File:wheelchair.jpg|Power-Assisted Wheelchair. Embedded Controller in C.
File:robofei.png|[https://eriveltongualter.github.io/robotsoccer.html Strategy and Controller of robots to play soccer in C++].
File:robofei.png|Strategy and Controller of robots to play soccer in C++.
</gallery>
</gallery>
'''Deep and detailed answer about programming language experience:'''
'''Deep and detailed answer about programming language experience:'''
Line 122: Line 122:
I will discuss the project with the mentor aiming to refine this proposal goals and timeline.
I will discuss the project with the mentor aiming to refine this proposal goals and timeline.


The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/pages/pelcian.html#pelcian https://eriveltongualter.github.io/GSoC2018/].
The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/ https://eriveltongualter.github.io/GSoC2018/].
 


==== Phase 1  Initial phase of coding ====
==== Phase 1  Initial phase of coding ====
Line 132: Line 133:
* The goal at this point is to create the layout of the plots.
* The goal at this point is to create the layout of the plots.
* The distribution in the plots will be fixed at this point. However, in Phase 2 the function will have attributes to choose the desired diagrams in the interface. Example: sisotool(Gb, 'rlocus', 'nyquist');
* The distribution in the plots will be fixed at this point. However, in Phase 2 the function will have attributes to choose the desired diagrams in the interface. Example: sisotool(Gb, 'rlocus', 'nyquist');


'''Week 3  (28 May - 3 June)}'''
'''Week 3  (28 May - 3 June)}'''
Line 138: Line 140:
* Polos and zeros can be reallocated by dragging with the left button of the mouse.
* Polos and zeros can be reallocated by dragging with the left button of the mouse.


'''Week 4 & 5 (4 June - 17 June)'''
'''Week 4 \& 5 (4 June - 17 June)'''
* Any remaining work will be completed;
* Any remaining work will be completed;
* Submission of Phase 1 evaluation;
* Submission of Phase 1 evaluation;
* Complete post about the phase with detailed documentation.
* Complete post about the phase with detailed documentation.


==== Phase 2 ====
==== Phase 2 ====
Line 158: Line 161:


==== Phase 3 ====
==== Phase 3 ====
'''Week 10 & 11 (16 July - 29 July)'''
Week 10 \& 11 (16 July - 29 July)}
* Add Step Response Time functionality. The user can select the step response to visualize the characteristics of the output, such as: Rise time and Peak Overshoot.
* Add Step Response Time functionality. The user can select the step response to visualize the characteristics of the output, such as: Rise time and Peak Overshoot.
* Export compensator design to the workspace.
* Export compensator design to the workspace.


'''Week 12 (30 July - 5 August)'''
Week 12 (30 July - 5 August)
* Any remaining work will be completed.  
* Any remaining work will be completed.  


'''Week 13 (6 August - 14 August)'''
Week 13 (6 August - 14 August)
* Complete post about the phase with detailed documentation.
* Complete post about the phase with detailed documentation.
* Final Submission
* Final Submission
Mentor for this project: '''Doug Stewart'''
Please note that all contributions to Octave may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see Octave:Copyrights for details). Do not submit copyrighted work without permission!

To edit this page, please answer the question that appears below (more info):

Cancel Editing help (opens in new window)