29
edits
Erigualter (talk | contribs) |
Erigualter (talk | contribs) m (→Y: Your task) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= Public application - Erivelton Gualter = | = Public application - Erivelton Gualter (dev101) = | ||
== A: An introduction == | == A: An introduction == | ||
Line 122: | Line 122: | ||
I will discuss the project with the mentor aiming to refine this proposal goals and timeline. | I will discuss the project with the mentor aiming to refine this proposal goals and timeline. | ||
The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/ https://eriveltongualter.github.io/GSoC2018/]. | The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/pages/pelcian.html#pelcian https://eriveltongualter.github.io/GSoC2018/]. | ||
==== Phase 1 Initial phase of coding ==== | ==== Phase 1 Initial phase of coding ==== | ||
Line 168: | Line 168: | ||
* Complete post about the phase with detailed documentation. | * Complete post about the phase with detailed documentation. | ||
* Final Submission | * Final Submission | ||
Mentor for this project: '''Doug Stewart''' |
edits