User:Erigualter: Difference between revisions

Jump to navigation Jump to search
m
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Public application - Erivelton Gualter =
= Public application - Erivelton Gualter (dev101) =


== A: An introduction ==
== A: An introduction ==
Line 122: Line 122:
I will discuss the project with the mentor aiming to refine this proposal goals and timeline.
I will discuss the project with the mentor aiming to refine this proposal goals and timeline.


The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/ https://eriveltongualter.github.io/GSoC2018/].
The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/pages/pelcian.html#pelcian https://eriveltongualter.github.io/GSoC2018/].
 


==== Phase 1  Initial phase of coding ====
==== Phase 1  Initial phase of coding ====
Line 133: Line 132:
* The goal at this point is to create the layout of the plots.
* The goal at this point is to create the layout of the plots.
* The distribution in the plots will be fixed at this point. However, in Phase 2 the function will have attributes to choose the desired diagrams in the interface. Example: sisotool(Gb, 'rlocus', 'nyquist');
* The distribution in the plots will be fixed at this point. However, in Phase 2 the function will have attributes to choose the desired diagrams in the interface. Example: sisotool(Gb, 'rlocus', 'nyquist');


'''Week 3  (28 May - 3 June)}'''
'''Week 3  (28 May - 3 June)}'''
Line 140: Line 138:
* Polos and zeros can be reallocated by dragging with the left button of the mouse.
* Polos and zeros can be reallocated by dragging with the left button of the mouse.


'''Week 4 \& 5 (4 June - 17 June)'''
'''Week 4 & 5 (4 June - 17 June)'''
* Any remaining work will be completed;
* Any remaining work will be completed;
* Submission of Phase 1 evaluation;
* Submission of Phase 1 evaluation;
* Complete post about the phase with detailed documentation.
* Complete post about the phase with detailed documentation.


==== Phase 2 ====
==== Phase 2 ====
Line 161: Line 158:


==== Phase 3 ====
==== Phase 3 ====
Week 10 \& 11 (16 July - 29 July)}
'''Week 10 & 11 (16 July - 29 July)'''
* Add Step Response Time functionality. The user can select the step response to visualize the characteristics of the output, such as: Rise time and Peak Overshoot.
* Add Step Response Time functionality. The user can select the step response to visualize the characteristics of the output, such as: Rise time and Peak Overshoot.
* Export compensator design to the workspace.
* Export compensator design to the workspace.


Week 12 (30 July - 5 August)
'''Week 12 (30 July - 5 August)'''
* Any remaining work will be completed.  
* Any remaining work will be completed.  


Week 13 (6 August - 14 August)
'''Week 13 (6 August - 14 August)'''
* Complete post about the phase with detailed documentation.
* Complete post about the phase with detailed documentation.
* Final Submission
* Final Submission
Mentor for this project: '''Doug Stewart'''
29

edits

Navigation menu