Editing User:Erigualter
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 1: | Line 1: | ||
= Public application - Erivelton Gualter | = Public application - Erivelton Gualter = | ||
== A: An introduction == | == A: An introduction == | ||
Line 122: | Line 122: | ||
I will discuss the project with the mentor aiming to refine this proposal goals and timeline. | I will discuss the project with the mentor aiming to refine this proposal goals and timeline. | ||
The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/ | The tasks, notes and decisions made during this week will be posted in the following blog which is already is ready published: [https://eriveltongualter.github.io/GSoC2018/ https://eriveltongualter.github.io/GSoC2018/]. | ||
==== Phase 1 Initial phase of coding ==== | ==== Phase 1 Initial phase of coding ==== | ||
Line 158: | Line 159: | ||
==== Phase 3 ==== | ==== Phase 3 ==== | ||
Week 10 \& 11 (16 July - 29 July)} | |||
* Add Step Response Time functionality. The user can select the step response to visualize the characteristics of the output, such as: Rise time and Peak Overshoot. | * Add Step Response Time functionality. The user can select the step response to visualize the characteristics of the output, such as: Rise time and Peak Overshoot. | ||
* Export compensator design to the workspace. | * Export compensator design to the workspace. | ||
Week 12 (30 July - 5 August) | |||
* Any remaining work will be completed. | * Any remaining work will be completed. | ||
Week 13 (6 August - 14 August) | |||
* Complete post about the phase with detailed documentation. | * Complete post about the phase with detailed documentation. | ||
* Final Submission | * Final Submission | ||