User:Sandeepmv: Difference between revisions

Jump to navigation Jump to search
1,769 bytes added ,  15 March 2014
No edit summary
Line 52: Line 52:
I will prefer to work on mapping package if a mentor is interested in it and is available.   
I will prefer to work on mapping package if a mentor is interested in it and is available.   
* '''Rough time estimates:'''
* '''Rough time estimates:'''
* For Mapping Package:
** Week 0 (May 19 to May 26): Familiarizing with Octave code. Research on the methods on how to implement the functions in standard file I/O [http://www.mathworks.in/help/map/standard-file-formats.html], Map layout and axis [http://www.mathworks.in/help/map/map-axes.html] and functions in Coordinate systems and Geodesy.[http://www.mathworks.in/help/map/index.html#coordinate-systems-geometric-geodesy-and-map-projections]. Creating a list of functions which can be implemented with the current features present in Octave.(Some functions that require methods which are not yet fully implemented in Octave, like classdef will not be included)
** Week 1 to Week 4 (June 3 to June 23): Complete the implementation of missing functions that are selected in week 0 from Modelling the Earth[http://www.mathworks.in/help/map/modeling-the-earth.html] and Lengths and angles [http://www.mathworks.in/help/map/lengths-and-angles.html]. Clean the code of 3D Coordinate system functions that I have already implemented and perform tests. Submit the almost complete Coordinate systems and Geodesy functions package for mid term evaluation. 
** Week 5 to Week 8 (June 24 to July 22): Complete the implementation of missing functions in Standard file I/O[http://www.mathworks.in/help/map/standard-file-formats.html] and Map layout and axis [http://www.mathworks.in/help/map/map-axes.html].
** Week 9 (July 23 to July 29): Fixing bugs, code clean up and Making the entire code Matlab compatible.
** Week 10 to Week 12 (July 30 to August 18): Write tests and Documentation. Code clean up and finalization. End of GSOC.
** After GSOC: Maintenance of Mapping Package in Octave Forge.
* For Implementation of Geometric Integrators for Hamiltonian Systems:
** Week 0, Week 1 (May 19 to June 2): To work with mentor on selecting the list of methods that need to be implemented and to study the mathematics of these methods in depth, Browsing through the Octave code to learn more.  
** Week 0, Week 1 (May 19 to June 2): To work with mentor on selecting the list of methods that need to be implemented and to study the mathematics of these methods in depth, Browsing through the Octave code to learn more.  
** Week 2 to Week 4 (June 3 to June 23): Start working on the essential methods and to finish the first half of the to do list that I will be creating during the community bonding period.
** Week 2 to Week 4 (June 3 to June 23): Start working on the essential methods and to finish the first half of the to do list that I will be creating during the community bonding period.
** Week 5 to Week 8 (June 24 to July 22): Complete work on all the remaining methods. Finish the basic m-file scripts for all the methods intended to be implemented by end of week 7.  
** Week 5 to Week 8 (June 24 to July 22): Complete work on all the remaining methods. Finish the basic m-file scripts for all the methods intended to be implemented by end of week 7.  
** Week 9 (July 23 to July 29): Fixing bugs, code clean up and Making the entire code Matlab compatible.  
** Week 9 (July 23 to July 29): Fixing bugs, code clean up and Making the entire code Matlab compatible.  
** Week 10 to Week 12 (July 30 to August 18): Write tests and Documentation. Code clean up and finalization.    
** Week 10 to Week 12 (July 30 to August 18): Write tests and Documentation. Code clean up and finalization.      
I have planned a 25 to 30 hour work schedule for every week.  
I have planned a 25 to 30 hour work schedule for every week.  


[[Category:2014]]
[[Category:2014]]
[[Category:Applicants]]
[[Category:Applicants]]
32

edits

Navigation menu